An urgent recruitment opportunity is available for Forklift Operators, Rigger III, Rigger II, and a Rigging Supervisor for a six-month industrial project in Ras Al Khair. The requirement includes 2 Forklift Operators, 3 Rigger III positions, 3 Rigger II positions, and 1 Rigging Supervisor. The recruitment is being handled by Hardrock Gen Cont, with the listed positions intended for project-based employment and mobilization according to the employer’s requirements.
Key Responsibilities and Duties
Forklift Operators will be responsible for operating lifting equipment and handling materials safely within the assigned work area, while following established site procedures. Rigger III and Rigger II personnel will support lifting and rigging activities, including preparing loads, connecting lifting accessories, coordinating with equipment operators, and maintaining safe lifting practices. The Rigging Supervisor will oversee rigging operations, coordinate rigging personnel, monitor lifting activities, and help ensure that assigned work is carried out according to project requirements. Each position requires workers to perform duties appropriate to their designated role and level.
Required Skills and Qualifications
Forklift Operator applicants must have a valid license and TUV certification as specifically stated in the vacancy. Rigger III and Rigger II applicants must hold the required TUV qualification. Candidates applying for the Rigging Supervisor position should have relevant knowledge of rigging operations and the ability to supervise assigned rigging activities. Applicants should also be prepared to provide the required Ajeer documentation for the project. Candidates are advised to ensure that their qualifications and documents are available for verification before mobilization.
Complete Job Details
| Job Detail | Information |
|---|---|
| Job Position | Forklift Operator |
| Vacancies | 02 Nos. |
| Requirement | License & TUV |
| Job Position | Rigger III |
| Vacancies | 03 Nos. |
| Requirement | TUV |
| Job Position | Rigger II |
| Vacancies | 03 Nos. |
| Requirement | TUV |
| Job Position | Rigging Supervisor |
| Vacancies | 01 No. |
| Location | Ras Al Khair |
| Duration | 6 Months |
| Documents | Ajeer |
| Company | Hardrock Gen Cont |
| Contact Person | Arun.P |
| Contact Number | 0593498058 |
| Office Location | Provided in the vacancy |
Interested candidates should contact Arun.P at 0593498058 for recruitment details and submission instructions. Applicants should keep their relevant licenses, TUV qualifications, and Ajeer documentation ready for verification as applicable to their position.
Application Process and Safety
Candidates should verify the position they are applying for and confirm the required qualification, documentation, project duration, and employment terms with the recruitment representative before proceeding. Since different vacancies have different certification requirements, applicants should provide documents corresponding to their specific role. The office location has been supplied with the vacancy for recruitment purposes. Candidates should use legitimate recruitment channels and verify the employer and project information before submitting original documents or making any payment. No individual should be paid for guaranteed selection, employment, or mobilization.